Fengxian Situan Primary School Comprehensive Building General Contracting Project

7.6(1)

7.6(1)

7.9(1)

7.9(1)

7.7(1)

7.7(1)

7.8

7.8

  • Product description
  • Location: Fengxian District, Shanghai

    Construction Area: 9,348.9㎡

    Project Overview: The beam-column joints of the steel frame in the project adopt high-strength bolts + welding connections, requiring high precision in component detailing and processing. With an assembly rate of 51.69%, prefabricated technologies are applied in the main structure, exterior and interior partition walls, decoration, and equipment pipelines, reflecting the concepts of green building and industrialized construction.