GCGV Project Modular Steel Structure Fabrication Project

98b07420-75a4-45d1-afab-5fad780ad9b5

98b07420-75a4-45d1-afab-5fad780ad9b5

28143372-a971-4e21-a498-87cf283cb809

28143372-a971-4e21-a498-87cf283cb809

208e5db1-10db-4486-9a64-2079990c48a3

208e5db1-10db-4486-9a64-2079990c48a3

398b07420-75a4-45d1-afab-5fad780ad9b5

398b07420-75a4-45d1-afab-5fad780ad9b5

298b07420-75a4-45d1-afab-5fad780ad9b5

298b07420-75a4-45d1-afab-5fad780ad9b5

498b07420-75a4-45d1-afab-5fad780ad9b5

498b07420-75a4-45d1-afab-5fad780ad9b5

198b07420-75a4-45d1-afab-5fad780ad9b5

198b07420-75a4-45d1-afab-5fad780ad9b5

  • Product description
  • Location: Texas, USA

    Implementation Year: 2019

    Steel Consumption: 5,500t

    Project Overview: The project adopted Chinese standard materials and American standard fabrication. Our scope included detailing, material supply, fabrication, inspection, anti-corrosion (mainly galvanizing, with some painting), and transportation to Haimen, Jiangsu.

    Project Features: Steel frame–bracing structure, Chinese standard materials, English drawings. During shop detailing, coordination with the design team and Haimen Yanda ensured that each weld, fireproofing, and painting section was marked and numbered for traceability. After fabrication, all components were pre-assembled at Haimen Yanda into a complete module for shipment.