  • Product description
  • Location: Lomé, Togo

    Implementation Year: 2012

    Steel Consumption: 3,360t

    Project Overview: The terminal building’s first floor adopts reinforced concrete, while upper floors use large-span steel structures. The roof structure is a bolt-sphere grid with square pyramids. The steel works include secondary interior structures, main frame, exterior curved beams, roof grid, and jet bridge steel and roof structures.