GNPK Power Plant Project, Philippines
- Product description
Implementation Year: 2019
Steel Consumption: 18,000T
Project Overview: The project used Chinese-standard materials with American-standard fabrication. Our scope included detailing, material supply, fabrication, inspection, anti-corrosion (mainly galvanizing, some painting), and transport to Haimen, Jiangsu.
Project Features: Steel frame–bracing structure, Chinese-standard materials, English drawings. During detailing, we coordinated with the design team and Haimen Yanda to mark and number every weld, fireproofing, and painting section for full traceability. After fabrication, all components were pre-assembled at Haimen Yanda into a complete module for shipment.