Serbia Zijin Bor Copper Steel Structure Project

1ab1fc379-0272-4469-9650-8798ee999a12

1ab1fc379-0272-4469-9650-8798ee999a12

2ab1fc379-0272-4469-9650-8798ee999a12

2ab1fc379-0272-4469-9650-8798ee999a12

3ab1fc379-0272-4469-9650-8798ee999a12

3ab1fc379-0272-4469-9650-8798ee999a12

4ab1fc379-0272-4469-9650-8798ee999a12

4ab1fc379-0272-4469-9650-8798ee999a12

  • Product description
  • Location: Bor District, Republic of Serbia

    Implementation Year: 2020

    Steel Consumption: 7,000t

    Project Overview: This project is part of the Zijin Mining Serbia Bor Copper MS Mine technical upgrade, covering the grinding and flotation workshops and intermediate ore bins. Zijin Mining acquired 63% of RTB Bor in 2018.

    Project Features: Steel frame–bracing structure, English drawings. This was a design-and-build-in-parallel project. During shop detailing, coordination with the design institute optimized joint plate dimensions, while communication with equipment manufacturers ensured proper interface and delivery alignment between steel structures and equipment.