Steel Structure Project for Phase I of Zhongji Rizon Diesel Engine Co., Ltd.
- Product description
Location: Zhoushan City, Zhejiang Province
Construction Area: 39,600㎡
Tonnage: 12,000t
Enclosure Area: 103,264㎡
Project Overview: The pre-installation workshop and general assembly workshop adopt steel bent frame grid structures, while the auxiliary machine room and imported assembly parts warehouse adopt portal steel frames. The general assembly workshop has a construction area of 16,750 square meters, the pre-installation workshop 10,060 square meters, the auxiliary machine room 6,670 square meters, and the imported assembly parts warehouse 5,220 square meters.