Metal Roof Project of T3 Terminal Building in Phase III Expansion Project of Guiyang Longdongbao International Airport

贵阳龙洞堡机场效果图(1)

贵阳龙洞堡机场效果图(1)

R-C (2)(1)

R-C (2)(1)

guiyang2

guiyang2

94565

94565

89898989(1)

89898989(1)

VCG211350267339(1)(1)

VCG211350267339(1)(1)

e5ee0e53-4626-4dcc-95d3-e600bc64bcf6

e5ee0e53-4626-4dcc-95d3-e600bc64bcf6

  • Product description
  • Location:Guiyang, Guizhou

    Construction Area:167000㎡

    Tonnage:14000t

    Project Overview:It was a key planned construction project of Guizhou Province during the 12th Five-Year Plan period. The project is designed to meet the targets of a passenger throughput of 30 million, a cargo and mail throughput of 250,000 tons, and an aircraft movement of 243,000 sorties by 2025, with a new 4,000-meter-long runway to be built. Efforts will be made to ensure that the project wins the "Huangguoshu" Cup Guizhou Provincial Quality Project Award and strive for the "Luban Prize".