邮箱
Search
Search
Cancel

NEWS

/
/
/
Dadi Steel Structure Gree Electric Appliances (Nanjing) central air conditioning project labor competition mobilization meeting was held at the construction site

Dadi Steel Structure Gree Electric Appliances (Nanjing) central air conditioning project labor competition mobilization meeting was held at the construction site

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2019-11-29 17:53
  • Views:

Dadi Steel Structure Gree Electric Appliances (Nanjing) central air conditioning project labor competition mobilization meeting was held at the construction site

(Summary description)At 7:00 pm on November 29, 2019, the steel structure engineering labor competition mobilization meeting of the Dadi Steel Structure Gree Electric Appliances (Nanjing) Central Air Conditioning Project was held on the site. , The on-site person in charge of the collaboration unit attended the meeting. Zhejiang Dadi Steel Structure Co., Ltd. undertook the construction of 7 main monomers and some auxiliary structures of Gree Electric Appliances (Nanjing) Central Air Conditioning Project in the 1st and 3rd bid sections. Bid 1 is at the stage of finishing the steel structure and construction of the enclosure structure, while Bid 3 is in the peak period of steel structure fabrication and installation. According to the requirements of the owner and the general contractor for the promotion of the project, before the Spring Festival in 2020, it is required that the project of tender 1 will be completed and delivered, and the main structure of the project of tender 3 will be completed. In order to stimulate and mobilize the enthusiasm and creativity of the front-line management personnel and the construction team, and fully complete the production task, the company's labor union has carried out this labor of "rushing up the construction period and ensuring the nodes" in a timely manner. competition. This labor competition is not limited to the construction site, but also includes the main management and coordination departments for project implementation such as the Design Institute, the Quality and Safety Department, the Manufacturing Department, and the Engineering Management Department. Although the construction period is an important assessment factor, the content of the competition is also At the same time, it covers the requirements of safe production, engineering quality, and management services; the competition includes not only the management department, but also the processing workshop, production and installation collaboration team for project implementation. It embodies the concept of "whole process, full participation" of labor competition, and creates a working atmosphere for the comprehensive and efficient promotion of the project. At the meeting, Deputy General Manager Xu Xiangjun made a mobilization speech for the labor competition, and on behalf of the company, he held a concise signing ceremony with representatives of the departments participating in the labor competition. And encourage everyone to face challenges, pay attention to management details, and integrate personal work into the hot project progress based on this competition, so that the experience of the Gree project becomes an important milestone in personal work career, and it is shown in the work. The strength and style of the collective and individual add brilliance to the brand image of Dadi Steel Structure.

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2019-11-29 17:53
  • Views:
Information
At 7:00 pm on November 29, 2019, the steel structure engineering labor competition mobilization meeting of the Dadi Steel Structure Gree Electric Appliances (Nanjing) Central Air Conditioning Project was held on the site. , The on-site person in charge of the collaboration unit attended the meeting.
Zhejiang Dadi Steel Structure Co., Ltd. undertook the construction of 7 main monomers and some auxiliary structures of Gree Electric Appliances (Nanjing) Central Air Conditioning Project in the 1st and 3rd bid sections. Bid 1 is at the stage of finishing the steel structure and construction of the enclosure structure, while Bid 3 is in the peak period of steel structure fabrication and installation. According to the requirements of the owner and the general contractor for the promotion of the project, before the Spring Festival in 2020, it is required that the project of tender 1 will be completed and delivered, and the main structure of the project of tender 3 will be completed. In order to stimulate and mobilize the enthusiasm and creativity of the front-line management personnel and the construction team, and fully complete the production task, the company's labor union has carried out this labor of "rushing up the construction period and ensuring the nodes" in a timely manner. competition.
This labor competition is not limited to the construction site, but also includes the main management and coordination departments for project implementation such as the Design Institute, the Quality and Safety Department, the Manufacturing Department, and the Engineering Management Department. Although the construction period is an important assessment factor, the content of the competition is also At the same time, it covers the requirements of safe production, engineering quality, and management services; the competition includes not only the management department, but also the processing workshop, production and installation collaboration team for project implementation. It embodies the concept of "whole process, full participation" of labor competition, and creates a working atmosphere for the comprehensive and efficient promotion of the project.
At the meeting, Deputy General Manager Xu Xiangjun made a mobilization speech for the labor competition, and on behalf of the company, he held a concise signing ceremony with representatives of the departments participating in the labor competition. And encourage everyone to face challenges, pay attention to management details, and integrate personal work into the hot project progress based on this competition, so that the experience of the Gree project becomes an important milestone in personal work career, and it is shown in the work. The strength and style of the collective and individual add brilliance to the brand image of Dadi Steel Structure.

 Copyright © Zhejiang Dadi Steel Structure Co., Ltd.  All rights reserved. Powered by www.300.cn     SEO