Tofflon Life Science Industrialization Base Steel Structure Project

14.6

14.6

304bed276-8e3f-4aaa-9fb6-99605c5d8f47

304bed276-8e3f-4aaa-9fb6-99605c5d8f47

204bed276-8e3f-4aaa-9fb6-99605c5d8f47

204bed276-8e3f-4aaa-9fb6-99605c5d8f47

104bed276-8e3f-4aaa-9fb6-99605c5d8f47

104bed276-8e3f-4aaa-9fb6-99605c5d8f47

14.7(1)

14.7(1)

  • Product description
  • Location: Hangzhou City, Zhejiang Province

    Construction Area: 178,633.74㎡

    Tonnage: 6,710t

    Project Overview: With a planned investment of 1.3 billion yuan, the project consists of 2 CDMO workshops, 2 auxiliary workshops, a scientific research office building, an underground garage, and related supporting facilities, all adopting steel frame structures. It aims to build an integrated industrial ecosystem for CGT pharmaceutical equipment, instruments, and consumables, establish product ecological advantages, realize localized replacement in this field.