Java Power Plant Projects, Indonesia
- Product description
Location: Java, Indonesia
Implementation Year: 2016
Steel Consumption: 8,000t
Project Overview: Our company undertook three power plant projects located in Indonesia—CJ, TJB, and Lontar. The EPC contractor was Black & Veatch (USA).
Project Features: Steel frame–bracing structure, American standard materials, English drawings. During detailed design and fabrication, continuous coordination was maintained with the overseas design team to resolve differences between domestic and international drawings, fabrication processes, and workmanship standards.