Singapore J108 Metro Station Project

微信图片_20231124153758-来源:LTA

微信图片_20231124153758-来源:LTA

2微信图片_20231124153758-来源:LTA

2微信图片_20231124153758-来源:LTA

3微信图片_20231124153758-来源:LTA

3微信图片_20231124153758-来源:LTA

4微信图片_20231124153758-来源:LTA

4微信图片_20231124153758-来源:LTA

  • Product description
  • Location: Singapore

    Implementation Year: 2024

    Steel Consumption: 1,700t

    Project Overview: This project includes three parts, JE1, JE2, and JE3. Node design, detailed drawings, and fabrication standards follow European standards (EN).

    Employer: Land Transport Authority, Singapore