邮箱
Search
Search
Cancel

NEWS

/
/
/
Successful First Hoist of the Steel Structure for Huaibei West Station

Successful First Hoist of the Steel Structure for Huaibei West Station

Successful First Hoist of the Steel Structure for Huaibei West Station

(Summary description)On October 28th, the first steel column for the newly built Huaibei West Station on the Huaisu-Bengbu Intercity Railway was successfully hoisted—marking the project’s official launch into main structure construction.The station spans 21,991 square meters with a height of 37.5 meters. It integrates a reinforced concrete frame structure with a diagonal steel truss system, comprising an elevated station house above the tracks and a side station building. Passengers will access the station via the second-floor drop-off platform.The roof, covering a projected area of approximately 19,500 square meters, is supported by 29 circular concrete-filled steel tube columns through a diagonal steel truss system. It features a maximum span of 132.4 meters and a maximum overhang of 9.2 meters, with skylights positioned at a top elevation of 32.8 meters.As a key node on the Huaisu-Bengbu Intercity Railway, Huaibei West Station will function as a vital link connecting the Northern Anhui Urban Agglomeration to the Hefei Metropolitan Circle. This will significantly enhance the region’s transportation accessibility.The project team remains committed to the craftsmanship spirit of striving for excellence, delivering safe, high-quality, and efficient construction. We will ensure full contract compliance and satisfactory delivery, adding new impetus to the economic and social progress of Huaibei and the wider Northern Anhui area.

Information

 

 

On October 28th, the first steel column for the newly built Huaibei West Station on the Huaisu-Bengbu Intercity Railway was successfully hoisted—marking the project’s official launch into main structure construction.

 

 

 

 

The station spans 21,991 square meters with a height of 37.5 meters. It integrates a reinforced concrete frame structure with a diagonal steel truss system, comprising an elevated station house above the tracks and a side station building. Passengers will access the station via the second-floor drop-off platform.

 

 

 

 

The roof, covering a projected area of approximately 19,500 square meters, is supported by 29 circular concrete-filled steel tube columns through a diagonal steel truss system. It features a maximum span of 132.4 meters and a maximum overhang of 9.2 meters, with skylights positioned at a top elevation of 32.8 meters.

 

As a key node on the Huaisu-Bengbu Intercity Railway, Huaibei West Station will function as a vital link connecting the Northern Anhui Urban Agglomeration to the Hefei Metropolitan Circle. This will significantly enhance the region’s transportation accessibility.

 

The project team remains committed to the craftsmanship spirit of striving for excellence, delivering safe, high-quality, and efficient construction. We will ensure full contract compliance and satisfactory delivery, adding new impetus to the economic and social progress of Huaibei and the wider Northern Anhui area.

 

 

Keyword:

 Copyright © Zhejiang Dadi Steel Structure Co., Ltd.  All rights reserved. Powered by www.300.cn     SEO