邮箱
Search
Search
Cancel

NEWS

/
/
/
The first lifting of the steel structure project of the 14-01 plot of Shanghai Jindingtiandi

The first lifting of the steel structure project of the 14-01 plot of Shanghai Jindingtiandi

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2021-11-08 11:39
  • Views:

The first lifting of the steel structure project of the 14-01 plot of Shanghai Jindingtiandi

(Summary description)At 13:38 on November 5th, the hoisting of the new office and apartment project on the 14-01 plot of Shanghai Jindingtiandi was successfully completed, officially kicking off the main construction of the steel structure. Jinding Tiandi is the core project of Jinqiao Group focusing on the "Golden Central Development Belt", and it is a model work and demonstration area of ​​Shanghai's industry-city integration. The 14-01 plot has a mixed property of "office + residence". The project is located in the 61/4 hill base of the 15th block of Caolu Town, Pudong New Area, Shanghai. The total construction area is 77,433.14 square meters, of which the above-ground construction area is 49,015.77 square meters and the underground construction area is 28,417.37 square meters. Two single buildings, Building 1 and Building 2, are newly built on the ground of this project. Building 1 has 16 floors. The main structural form is a steel frame-concrete core tube system, and its main function is business office. The 11th floor of Building 2 is for the overall assembly Type-shear wall system, the main function is to rent apartments. There are two underground floors, using a reinforced concrete frame system, which functions as a garage and an equipment room. The smooth hoisting of the first steel column has boosted morale. The project team will go all out to promote the project construction on the premise of "safety, quality, and construction period" to ensure high standards and high-quality completion and delivery of the project, and help build the largest scale in Shanghai. A new model of industry-city integration.

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2021-11-08 11:39
  • Views:
Information

       

 

       At 13:38 on November 5th, the hoisting of the new office and apartment project on the 14-01 plot of Shanghai Jindingtiandi was successfully completed, officially kicking off the main construction of the steel structure.

 

 

 

    

   Jinding Tiandi is the core project of Jinqiao Group focusing on the "Golden Central Development Belt", and it is a model work and demonstration area of Shanghai's industry-city integration. The 14-01 plot has a mixed property of "office + residence". The project is located in the 61/4 hill base of the 15th block of Caolu Town, Pudong New Area, Shanghai. The total construction area is 77,433.14 square meters, of which the above-ground construction area is 49,015.77 square meters and the underground construction area is 28,417.37 square meters.

   Two single buildings, Building 1 and Building 2, are newly built on the ground of this project. Building 1 has 16 floors. The main structural form is a steel frame-concrete core tube system, and its main function is business office. The 11th floor of Building 2 is for the overall assembly Type-shear wall system, the main function is to rent apartments. There are two underground floors, using a reinforced concrete frame system, which functions as a garage and an equipment room.

   The smooth hoisting of the first steel column has boosted morale. The project team will go all out to promote the project construction on the premise of "safety, quality, and construction period" to ensure high standards and high-quality completion and delivery of the project, and help build the largest scale in Shanghai. A new model of industry-city integration.

Keyword:

 Copyright © Zhejiang Dadi Steel Structure Co., Ltd.  All rights reserved. Powered by www.300.cn     SEO