邮箱
Search
Search
Cancel

NEWS

/
/
/
The steel structure project of Duyun Mass Sports Center has entered the construction stage of the main structure

The steel structure project of Duyun Mass Sports Center has entered the construction stage of the main structure

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2017-12-15 20:49
  • Views:

The steel structure project of Duyun Mass Sports Center has entered the construction stage of the main structure

(Summary description)

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2017-12-15 20:49
  • Views:
Information

On November 11, 2017, with the completion of the hoisting of the first main truss of the Duyun Mass Sports Center, it means that the steel structure project of the Duyun Mass Sports Center Stadium, which is produced and installed by our company, has officially entered the construction stage of the main structure.

The stadium project is located on the north side of the new site of No. 2 Middle School in Duyun City, Guizhou Province, at the intersection of Guixin Expressway and Maojian Avenue. The entire stadium is mainly composed of four areas: south, east, north and west. The steel trusses in each area are composed of cantilevered triangular trusses. The north and south stands are composed of 15 triangular trusses. The heaviest truss weighs about 14t and has a length of about 30.9m. Each area consists of 22 triangular trusses, the heaviest truss in the stadium weighs about 19t, and the longest cantilever truss is about 45m in length.

The entire stadium has a saddle-shaped appearance and will become a new landmark building in Duyun.

 

 Copyright © Zhejiang Dadi Steel Structure Co., Ltd.  All rights reserved. Powered by www.300.cn     SEO